Contact
Back

Scope of Work

Geological Survey & Mine Planning

Industry

Coal Mining

Project Phase

Pre-Operational Stage

Wagon & Truck Loading
Accurate Weighment
Documentation Compliance
Final Evacuation

Description

At Max Samruddhi Mining Pvt. Ltd., every mining project begins with detailed geological assessment and scientific mine planning to ensure technical feasibility, economic viability, and full regulatory compliance.

1. Geological Exploration & Reserve Estimation

Comprehensive geological surveys, core drilling analysis, and accurate reserve estimation to determine the quantity and quality of coal reserves.

2. Mine Plan Preparation & Statutory Approval

Preparation of detailed mine plans including production strategy, safety measures, and compliance documentation for statutory approvals from concerned authorities.

3. Bench Design & Pit Layout Planning

Scientific design of benches, slope angles, haul roads, drainage systems, and overall pit configuration to ensure safe and efficient mining operations.

4. Production Scheduling & Stripping Ratio Analysis

Strategic short-term and long-term production planning along with stripping ratio calculations to optimize cost efficiency and operational performance.

5. Environmental Clearance & Regulatory Compliance

Obtaining Environmental Clearance (EC), Consent to Operate (CTO), and ensuring adherence to statutory norms before commencement of mining activities.